INDUSTRIAL SPACE FOR LEASE WITH RAILROAD SPUR 103,022 sf | AMERICA REALTY

INDUSTRIAL SPACE FOR LEASE WITH RAILROAD SPUR 103,022 sf

IDENTIFICATION CODE: BYN-RTA-ESCO-9571-0-RC

Industrial Space For lease with Railroad Spur 103,022 sf, expandable up to 324,000 sf, GREEN LEED CERTIFICATION inside industrial park, fenced and gated, security 24/7, railroad spur aside, rail access to KCSM and FERROMEX, clear height 34 ft, hebel walls, ultra lam roof with natural light, 6 loading docks with levelers + 1 ramp, excellent access to Laredo and Saltillo Highways IMMEDIATE AVAILABILITY.

General Information

 

  • Type of Contract: Lease
  • Market: Monterrey
  • Sub-market: Escobedo
  • Location: Arco Vial between Laredo and Saltillo highways
  • Warehouse Price: $ 0.38 u.s.dls/sf + V.A.T. / month
  • Total price: $39,148.= u.s.dls. + V.A.T.
  • Common expenses fee (Warehouse):   $ 5,151.= u.s.dls. + V.A.T./ month
  • Warehouse / Production area: 103,022 sf, expandable up to 324,000 sf
  • Offices area: Built to Suit
  • Parking Spaces: To suit
  • Loading docks: 6 with levelers
  • Ramps: 1
  • Year of Construction: 2018

Advantages

 

  • INDUSTRIAL SPACE FOR LEASE WITH RAILROAD SPUR
  • GREEN LEED CERTIFICATION
  • INSIDE INDUSTRIAL PARK IN ESCOBEDO
  • FENCED AND GATED WITH CONTROLLED ACCESS
  • CROSS DOCK
  • 1.86 MILES OF RAILROAD SPUR INSIDE THE PARK
  • SECURITY 24/7 (SECURITY BOLLARDS AND 13 CCTV CAMERAS)
  • PERIMETER FENCE 9.84 ft HEIGHT
  • PUBLIC TRANSPORTATION IN FRONT THE PARK
  • NATURAL LIGHT PRODUCTION/WAREHOUSE AREA
  • ALL THE UTILITIES 
  • SERVICE AREA FOR DRIVERS WITH BATHROOMS AND SHOWERS
  • WALLS: HEBEL ACC4 PANEL
  • ROOF: ULTRALAM
  • FLOOR: 6.6″ CONCRETE 
  • CLEAR HEIGHT 34 FT
  • IMMEDIATE AVAILABILITY

Dimensions

 

  • Production / Warehousing area:  aprox. 344.47  x 295.26 ft
  • Clear height: 34 ft
  • Bay size: 49.21 x 49.21 ft

Construction Specifications

 

  •  Structure: Metallic, rigid frame
  • Roof: Ultralam
  • Interior floor: 6.6″ slab concrete
  • Walls: Hebel ACC4 panel

Accessories and Equipment included

 

  • Dock levelers: Yes
  • Rail spur: Yes, along the building

Park infrastructure

 

  • Water and drainage
  • Telephone net infrastructure
  • Railroad connection with Kansas KCSM and FERROMEX
  • 2.23 miles of perimeter fence 9.84 ft height
  • CCTV 13 cameras
  • Strategic location. Excellent access to Laredo and Saltillo highways
  • Wide green areas with golf area, two holes par 3 with a lake
  • Electric Substation 12.5 MVA
  • Water treatment plant
  • Trackmobile Hercules 2011 44,500 lbs



Name
*

Email
*

Phone
*

Message

Requieres Fields *